Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 12/12/2012 |
PLUMBING - GAS PRESSURE TEST |
|
Approved |
|
| 12/07/2012 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 12/06/2012 |
PLUMBING - GAS PRESSURE TEST |
|
Not ready for Inspection |
1. Secure the water heater enclosure- the back may not be against an openable window. Require cold shutoff at cold inlet. Require T&P relief drain to be extended, with no threads at the outlet. Vent connector not approved in unconditioned space. Water heater to sit at least three inches above the ground. Require ten pound test on system. Require approved gas valves. |