Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2013 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/11/2013 | PLUMBING - GAS PRESSURE TEST | Partial Approval | CHANGED FROM AP TO PARTIAL TO ALLOW GAS PRESSURE TEST. | |
| 12/31/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 12/21/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* GAS PIPE NOT TO PROPER DEPTH. 1) DUCT JOINTS NOT SEALED, CANS FRAMED 3 SIDES. 2) DWV AND TUBS NOT ON TEST. 3) REPLACE BROKEN STUDS AS NEEDED 4) NO HUB COUPLERS NOT ALLOWED ON ABS TO STEEL. 5) EXHAUST DUCT AND DRYER NET INSTALLED. |