Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2013 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/09/2013 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 12/27/2012 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* MAX #15 GAGE MAY BE USED WITH A 10 PSI TEST. GAGE SHALL HAVE 1/10 THE PSI INCREMENTATION. PROVIDE INFORMATION REQUESTED. COMPLETE NOTED CORRECTIONS. |
|
| 12/19/2012 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE PROVIDE THE INSULATION MANUAL FOR YOUR WATER HEATER. ALSO PROVIDE DATA PLATE INFORMATION, OR REPOSITION HEATER WITH PLATE VISIBLE. 1/2" PIPING IS UNDERSIZED FOR 100000 BTU @ 40' DEVELOPED LENGTH, PROVIDE A DEDICATEDD GAS SUPPLY SIZED PROPERLY FOR UNIT. A TEST IS REQUIRED FOR NEW PIPING. FRONT OF HEATER REQUIRES ACCESS. COMPLETE NOTED CORRECTIONS |
|
| 12/17/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |