Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2013 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/03/2013 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/03/2013 | PLUMBING - FINAL | Denied | DO NOT USE BLACK IRON PIPE IN THE T & P DRAIN. YOU CANNOT HAVE FLEX COPPER IN A T & P DRAIN. PROVIDE A 90 DEGREE ELBOW WHERE T & P DRAIN TERMINATES. REMOVE ALL FOIL TAPE FROM VENT PIPING. IT APPEARS SOME OF THE VENT MAY BE UPSIDE DOWN, MAYBE MIX MATCHED PIECES FROM DIFFERENT MANUFACTURERS. THERE NEEDS TO BE MIN 1" CLEARANCE FROM COMBUSTIBLES AT PENETRATION THROUGH ROOF. THE VENT NEEDS TO EXTEND ABOVE THE UPPER ROOF & WITH AN APPROVED CAP. PROVIDE ACCESS TO ROOF. PROVIDE COMBUSTION AIR INTO THE ENCLOSURE. THE GAS FLEX CONNECTOR CANNOT EXCEED 3' IN LENGTH. THE T & P DRAIN MUST SLOPE DOWNHILL THE ENTIRE WAY. |
|
| 03/07/2013 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* SORRY, THE MESSAGE COMPUTER IS DOWN TODAY AND WE CAN'T RETRIEVE OUR MESSAGES. PLEASE RECALL. THANKS |