Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2013 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection :* | |
| 01/25/2013 | ELECTRIC - SERVICE UPGRADE | Denied | dedicated work space per nec in front of service panel is to be 30" wide and 36" in front per 110.26 nec -dry wall screws nopt acceptable for riser suppport use 1/4" bolts, lags |
|
| 01/18/2013 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE FOLLOW RIGHT UP CORRECTIONS STILL TO BE MADE |
|
| 01/17/2013 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | 1. Item 2 dated 01/14/12-36" clearance is required all the way down to standing level. riser conduit is still too low per tep requirements the riser point of attachment is to be a minimum of 18" above top of wall | |
| 01/14/2013 | ELECTRIC - SERVICE UPGRADE | Denied | 1. SPLICES FOR GROUNDING ELECTRODE CONDUCTOR MUST BE IRRIVERSIBLE RATED FOR DIRECT BURIAL ALSO NEED 2 GROUND RODS 6' MIN APART WATE AND GAS BOND 2. MUST HAVE 36" CLEARANCE IN FRONT WOOD FENCE TO CLOSE RISER CONDUIT TO LOW LISTED SUPPORT CLAMP 3. CONDUITS NEED TO BE SUPPORTED TO CODE USE A QUALIFIED OR LICENSED ELETRICAL CONTR TO MAKE CORRECTIONS |