Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T12CM07432
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/07/2013 | FIRE - FINAL | Approved | ||
01/26/2013 | FIRE - FINAL | Partial Approval | Temp C of O for 1st floor and 2nd floor okay keep Occ. load to 99 on 2nd floor at all times, for final the following is needed: 1. repair or replace flow switch on main riser failed to work. 2. Finish all construction such as installing egress doors putting egress doors back in service. |
|
01/24/2013 | FIRE - FINAL | Partial Approval | Temp C of O okay to use first floor and 2nd floor. Note 2nd floor only 99 Occ. load. | |
01/23/2013 | FIRE - FINAL | Cancelled | ||
01/16/2013 | FIRE - FINAL | Partial Approval | TEMP CofO okay for 2nd floor use Occ Load of 99 only To get full CofO the following will need to be completed: Meet all Code requirements ie exiting, back up lighting ect. Add coverage in elevator pit Move horn/strobe away from side wall sprinkler in south stairwell 2nd floor. Install pre-action system completely. |