Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2016 | BUILDING - FINAL | Approved | ||
| 09/09/2016 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A VACUUM BREAKER FOR THE SHOWER WAND. 2- SHALL CAULK THE BOWL OF THE WATER CLOSET. 3- SHALL PROVIDE A 1" CLEARANCE AROUND THE WATER HEATER FLU VENT. 3- SHALL REMVOE THE FLEX CONNECTOR ON THE WATER HEATER T & P DARIN AND PROVIDE A FULL BORE DRAIN 3/4" COPPER ALL THE WAY TO THE BRASS NIPPLE OR VALVE. 5 SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT ON THE WATER HEATER VENT CONNECTOR. * |
|
| 03/11/2016 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/21/2015 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* |