Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2013 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :* |
| 01/15/2013 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
|
| 01/14/2013 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1. Horizontal change of direction exceeding 135 degrees requires a full size clean-out. If you install clean-out fittings during the rough, you will only have to retest above the clean-outs. Each stack to have a full size clean-out at the base. |