Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2012 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1. No excavation in the right of way permits for either the sewer in the street right of way or the water line in the alley. 2. Clean outs are to open in the direction of flow. (No correction required at this time) 3. Property line cleanout may not terminate in the easement. |
| 11/07/2012 |
PLUMBING - FINAL |
|
Approved |