Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/10/2013 | BUILDING - FINAL | Approved | ||
| 07/09/2013 | BUILDING - FINAL | Denied | expose 2nd ground rod need back flow prevernter on hose bib need insulation cert |
|
| 06/14/2013 | BUILDING - FINAL | Denied | Correct: 1) condensate on interior unit 2) TPR on both 3) main ground 4) paint abs 5) back flow preventer on bibs and insulate 6) gfi at south kit counter 7) safety glass at master tub |
|
| 06/14/2013 | BUILDING - FINAL | Denied | CORRECT: 1. CONDENSATE ON INTERIOR UNIT 2. TPR ON BOTH 3. MAIN GROUND 4. PAINT ABS 5. BACKFLOW PREVENTER ON BIB & INSULATE 6. GFI AT S. KIT COUNTER 7. SAFETY GLASS AT MASTER TUB |