Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/07/2012 | PLUMBING - FINAL | Not ready for Inspection | 10' OF COPPER REQUIRED FOR GROUND OR INSTALL 2ND GROUND ROD. WATER BOND REQUIRED. HOSE BIB VACUUM BREAKERS REQ. REMOVE ADHESSIVE TAPE FROM PEX PER MANUFACTURE OR TO BACKFILL TRENCH |
|
| 11/05/2012 | PLUMBING - FINAL | Not ready for Inspection | CAP OR REMOVE ABANDON VENT TEE. SECURE WH VENT WITH SCREWS CHECK RELIEF VALVE FOR PROPER OPERATION CAP STOVE IF NOT IN USE NEW YARD LINE WILL REQUIRE A PERMIT INSPECTION. NEW FURNACE REQ PERMIT. |