Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/15/2012 |
PLUMBING - FINAL |
|
Approved |
|
| 10/30/2012 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1. OK to cover underground. 2. Require test on entire system. OK 3. Require CSA approved gas valve for water heater. 4. Flex may not pass through the furness partition. 5. Single wall water heater vent through roof not approved. 6. Seal exterior wall penetration. 7. Require combustion relief to outside for water heater. |