Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2012 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 11/08/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | ALL NEW PIPING REQUIRES A 10' HEAD TEST PER CODE. "CHECK SLOPE" PLAN REVISION TO ELIMINATE VENTED P TRAPS. | |
| 11/07/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 11/06/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | PROVIDE VENTS AND CLEAN OUTS AS SHOWN INSTALL FHA DRAINS FOR TROUGH CONNECTIONS TEST PIPING. ( ENTER NW LOADING DOCK) |
|
| 11/05/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 11/01/2012 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | ANSWERED QUESTIONS FOR MUST FOLLOW PLAN SIZE AND USE APPROVED PLUMBING CONENCTIONS |