Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2013 | FIRE SPKLR - FINAL | Approved | ||
| 01/07/2013 | FIRE SPKLR - FINAL | Not ready for Inspection | Up rigths block by 2 x 4 truss and insulation needs to be 1 inch off the sprinkler heads. |