Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T12CM06483
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/16/2013 | FIRE - FINAL | Approved | Fire Final Approved. NOTE: All drive thru access gates and man gates shall stay open until all testing is done for the security lock system. | |
09/09/2013 | FIRE - FINAL | Partial Approval | Temp C of O Approved okay to rent apartments to get final C of O the following needs to be done: 1. Install FD key box on riser room door. 2. Install FD key box on FACP door. 3. FD key system install on all acesses gates or leave all man gates and access gate unlocked at all times. |
|
08/26/2013 | FIRE - FINAL | Partial Approval | Temp C of O Approved okay to rent apartments to get final C of O the following needs to be done: 1. Label door on riser room with the following: "RISER ROOM" 2. Install FD key box on riser room door. 3. Label outside of door for alarm panel with the following: FACP 4. Install FD key box on door. 5. 12 inch address number posted on front of building. 6. FD key system install on all acess gates |
|
08/22/2013 | FIRE - FINAL | Denied | 1. No bell for sprinkler system need to install 2. Room #2 sprinkler head problem in the hot water heater room - check room again 3. Room #3 Upright by front t door needs to be 12" from deck. Check Kitchen and in closet. - check room again 4. Room #5 sprinkler head taped in closet - check room again 5. Room #7 Check for taped head - check room again 6. Room #9 Check sprinklers in closets - check room again 7. Signs need on the inspectors test valve and on riser 8. Need riser room door labeled "RISER ROOM" 9. Still need flow test and flow readings 10. Need Fire Dept. key box installed on riser room door for access. 11. Need Fire Dept. key access for main gates and access gate |