Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2014 | BUILDING - FINAL | Approved | ||
| 05/08/2014 | BUILDING - FINAL | Not ready for Inspection | 1. U.V. protect armaflex at condensing unit. Note: taping is not an accepted method of U.V. protection. Install hammer arrestors at washer box. Make the corrections before calling 01090 bldg. final. Call in, and have approved, all required inspections prior to calling 01090 bldg. final. | |
| 04/14/2014 | BUILDING - FINAL | Not ready for Inspection | 1. NO FUSES IN A/C DISCONNECT BOX 2. H2O HEATER NOT HOOKED UP 3. FIRE SEAL SHEETROCK HOLES AT PLENUMS, THERMOSTAT WIRE AND DOORBELL 4. INSTALL SELF-CLOSER ON GARAGE MAN DOOR 5. STOPPED INSPECTION - NOT READY |