Inspection History Details
Inspection Status: Approved
Inspection History: EXT METAL CLIPS/EXT SHEATHING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2013 | EXT METAL CLIPS/EXT SHEATHING | Approved | IVRS - Inspection :* | |
| 01/18/2013 | EXT METAL CLIPS/EXT SHEATHING | Denied | IVRS - Inspection : See detailed listing on site.| 999* DETAIL DT1-2/10 LEDGER. ATTACHMENT PER PLAN- NAIL OF SHEATHING AND DOUBLE STUDS AT HOLD DOWNS |
|
| 01/15/2013 | EXT METAL CLIPS/EXT SHEATHING | Not ready for Inspection | canceled by Chad | |
| 01/11/2013 | EXT METAL CLIPS/EXT SHEATHING | Denied | -NAIL DOUBLE 2X FOR HOLD DOWNS TOGETHER 12' O.C - ENGINEERING APPROVAL FOR DADD ON DOUBLE 2X AT HOLD DOWN - H2.5'S NEEDED PER DETAIL 10/D1 - DETAIL 11 N D/1 TO PLAN AT BACK PATIO STOPPED INSPECTION TO MANY ITEMS TO LIST |