Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2013 | FIRE - FINAL | Approved | ||
| 03/05/2013 | FIRE - FINAL | Denied | 1. Fill in pocket ceiling with insulation or install sprinkler coverage or change all upright heads to QR type heads in the shell to meet open pocket ceiling requirements. (Pocket size 25' long x 31" deep x 3' wide). 2. Install suite numbers on door. |