Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2012 | BUILDING - FINAL | Approved | IVRS - Inspection :* OK FOR C OF O |
|
| 12/19/2012 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* air balance ok sterilization ok finish outdoor work |
|
| 12/17/2012 | BUILDING - FINAL | Not ready for Inspection | FINISH PANEL SCHEDULES FRONT FOR LARGE PANEL. SECURE COPPER & ABS PIPES AT WATER HEATER. BLOCK AND CLAMP GAS PIPING ON ROOF. DO NOT STACK BLOCKS. PROVIDE A PROTECTIVE COATING ON EXPOSED ARM A FLEX. PERMANENTLY I.D. EQUIPMENT ON ROOF. FINISH CONDENSATE PIPING ON ROOF. STEP UP TO 1" AT FIRST TEE. BLOCK AND CLAMP ELECTRIC. CONDUITS ON ROOF AND REPAIR ANY BROKEN. PROVIDE SUN SHIELDS AT CANVAS CONNECTORS. PROVIDE AIR BALANCE REPORT. BACKFLOW CERTS OK REPAIR SCREEN & TOP ON T-TOP. NEED STERILIZATION REPORT. WEST A/C DISCONNECT HAS BROKEN WIRE STRANDS & SOME NOT TO LUG. CANNOT CONFIRM FUSE SIZE FOR WEST A/C |