Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2012 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 12/03/2012 | MECHANICAL - FINAL | Cancelled | IVRS - RI canceled | |
| 11/29/2012 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* | |
| 09/10/2012 | MECHANICAL - FINAL | Denied | 14 psi test is ok left gas card pvc on roof must be supported every 4'. paint exposed pvc w' latex paint. use purple primer on all fittings prior to glue. connect elec conduit to disconnect at east unit. Do not use bricks to support gas piping. Secure to blks. Terminate condensate to wothin 6" of the ground. Properly connect elec conduit to disconnect at west unit slope condensate 1/8 " per ft. Provide a sunshield over canvas connector. Provide min 2" duct liner on all exposed duct on roof. Provide a 3" to 4" increase for vent on water heater. Install 3 screws in each joint of vent connector |
|
| 09/07/2012 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* |