Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2013 | EXCAVATION/LAYOUT REBAR & ZON | Approved | ||
| 03/14/2013 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 1) REMOVE 4 EACH #5 VERTS WITHIN CAR DOOR OPENINGS. 2) ADD 1 - #5 VERTICAL AT EAST JAMB OF WINDOW OPENING 3) REVISE PLANS FOR RELOCATION OF BUILDING. YOU STILL MEET SETBACK REQUIREMENTS BUT SHIFTING STRUCTURE TO EAST AND RELOCATING STORAGE SHED MUST BE DOCUMENTED ON SITE PLAN. 4) GAS PIPING APPEARS TO RUN UNDERNEATH NEW STRUCTURE. THIS PIPE WILL HAVE TO BE RELOCATED BEFORE FINAL AS IT IS NOT ALLOWED UNDER SLAB. CONCRETE FOR FOOTINGS MAY BE PLACED AFTER THESE MINOR CORRECTIONS AT OWNER'S RISK. |
|
| 03/12/2013 | EXCAVATION/LAYOUT REBAR & ZON | Denied | NO PLANS ON SITES |