Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/21/2012 | BUILDING - FINAL | Approved | OK SOLAR DGC RESD | |
| 09/20/2012 | BUILDING - FINAL | Partial Approval | 1. GROUNDING ELECTROD BOND JUMPER LOOSE-ALSO GROUNDING ELECRODE CONDUCTOR TO BE #8-250.66 2. NEED TORQUE VERIFICATION- PROVIDE ON COMPANY LETTER HEAD OTHER ITEMS * NOTE: IN FUTURE ALL WARNING LABELS TO BE ON COVERS OUTSIDE |
|
| 09/17/2012 | BUILDING - FINAL | Denied | 1. MAINTAIN WORKING SPACE IN FRONT OF DISCONNECT 2. HIGHEST BREAKER NOT OVER 6'7" 3. NEED LABELING PER 690.17 4. PROPERLY LABEL BREAKERS PER 408.4 5. CLEAN SURFACE UNDERGROUND BARS 250.12 6. TIGHTEN LOOSE CABLE FITTINGS 7. PLEASE VERIFY TORQUE SETTINGS FOR ROOF HWARDWARE 8. GAS BOND TO BE INTERIOR SIDE PIPING 250.104 |