Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2013 | ENGINEERING - FINAL | Approved | ||
| 07/25/2013 | ENGINEERING - FINAL | Partial Approval | PARTIAL APPROVAL FOR ENG FINAL PARTIAL OK AS LONG AS OCCUPANTS AND THE PUBLIC HAVE SAFE UNOBSTRUCTED ACCESS TO THE BLDG. ACCESS MUST BE SEPARATE FROM REMAINING CONSTRUCTION. FINAL APPROVAL NOT TO BE GIVEN UNTIL CONSTRUCTION IS COMPLETED. |
|
| 07/15/2013 | ENGINEERING - FINAL | Not ready for Inspection | PRIOR TO FINAL APPROVAL FOR ENGINEERING: 1) COMPLETE ALL ITEMS SHOWN ON THE APPROVED SITE/GRADING PLAN. 2) COMPLETE ALL ITEMS SHOWN ON THE LANDSCAPE PLAN 3) PROVIDE SAFE UNOBSTRUCTED ACCESS TO THE BLDG SEPARATE FROM CONSTRUCTION 4) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD AND AS-BUILT DRAWING AS STATED BY YOUR APPROVED PLANS - PERMIT # DP12-0138 |