Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/19/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/14/2012 | PLUMBING - FINAL | Not ready for Inspection | RDA REQUIRED AT CARBONATOR INSTALL AND TESWT CONNECT ALL BEV EQUIPEMENT ICE MAKER NOT INSTALLED PVC AND ABS MAT NOT BE GLUED TOGETHER INSIDE BUILDING. SUPPOER ALL DRAINS, PROVIDE CLEARANCES | |
| 09/13/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/12/2012 | PLUMBING - FINAL | Not ready for Inspection | COMPLETE ALL PLUMBING WORK. CORRECT PVC TO ABS SOLVENT NEED CONNECTIONS CORRECT PIPE SIZE TO BACKFLOW ASSEMBLIES. 3/4" SHOWN. SUPPORT ALL PIPING AND COMPONENTS: 10 MIXING VALVE ETC. PIPE DRAIN FROM RP. NOTE PR MAY SERVE CARBONATED BEVERAGES ONLY. EACH TYPE OF BEV REQ SEPARATE BACKFLOW PROTECTION. DOUBLE SAN TOO NOT APPROVED FOR BACK TO BACK FIXTURES. CORRECT LEAKS, WATER TEST SINKS. |
|
| 09/11/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |