Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/19/2012 |
ELECTRIC - FINAL |
|
Approved |
IVRS - Inspection :* |
| 09/11/2012 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
1. Require three foot clearance in front of panels (both panels) 2. Schedule 80 above grade. OK. 3. Require plastic bushing for #4 and larger conductor (both panels) 4. Tape neutral conductor closer to the weatherhead. 5. Verify number 4 conductor at 70 amp. 6. Require surface contact at sub panel ground bar. 7. Verify permits for all new electrical work. 8. Panel labeling not correct. 9. Require gas and water bond to panel. |