Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2012 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/02/2012 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MISSING RAFTERS PER PLAN 2) COMPLETE OVERHANGS TO CODE |
|
| 09/28/2012 | FRAMING | Not ready for Inspection | CANCELLED | |
| 09/27/2012 | FRAMING | Denied | 1. COMPLY WITH KEY NOTE 7 5/8" PLYWOOD ROOF STEAHTING 2. EXPOSE ONE SIDE EACH COLUMN DETAIL A FOR INSPECTOR 3. MISSING COLUMN TO BEAM CONNECTORS POST CAPS KEY NOTE 0 4. WHICH FRAMING NOTE IS TO BE USED 1 OR 12? FOR PLYWOOD SHEATINGS 5. MISSING BIRDMOUTH RAFTER TO BEAM PER KEY NOTE M |