Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2012 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 08/24/2012 | EXCAVATION/LAYOUT REBAR & ZON | Denied | FORM STEM WALL COMPLETE UNDERGROUND PLUMBING -REMOVE WATER LINE FROM SLAB OR PROVIDE APPROVED MATERIALS-CONNECT KIT DRAIN DOWN STREAM OF BATHROOM GROUP. -CONNECT SHOWER ON STREAM OF WC. -PROVIDE A COMBO FOR VENT -TEST SYSTEM. WRAP ALL PIPING IN CONCRETE. -INSTALL TRACER WIRE ON ALL NON METALLIC PIPING. -12" MIN DEPTH -INSTALL A HOSE BIB VAC BREAKER -REMOVE BLACK IRON TEE AT HOSE BIB |