Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/19/2012 |
PLUMBING - INTERMEDIATE |
|
Approved |
|
| 09/07/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. Bent PVC piping, pressure fittings, minimum burial depth, and grade issues waived by LeeRay. PVC piping may not be directly embedded in concrete. Some piping already covered. |
| 09/04/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
|
| 08/29/2012 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
1. Rainwaterleaders and underground piping to be drainage fittings. Piping to be sloped to the tank. Backpitched sections not approved. 2. PVC installation stds. require the use of purple primer on every fitting. Expose all fittings for inspection. 3. Secure tracer wire to proper piping. Test down on rain leaders. Test down on gas piping. Trench soils are too wet for inspection. Under ground piping to be supported continuously on a firm bed. No bridging. |
| 08/28/2012 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
NO ACCESS FOR INSPECTIONS. |