Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T12CM04869

Parcel: 11014002G

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
12/19/2012 PLUMBING - INTERMEDIATE Approved
09/07/2012 PLUMBING - INTERMEDIATE Partial Approval 1. Bent PVC piping, pressure fittings, minimum burial depth, and grade issues waived by LeeRay. PVC piping may not be directly embedded in concrete. Some piping already covered.
09/04/2012 PLUMBING - INTERMEDIATE Partial Approval
08/29/2012 PLUMBING - INTERMEDIATE Not ready for Inspection 1. Rainwaterleaders and underground piping to be drainage fittings. Piping to be sloped to the tank. Backpitched sections not approved. 2. PVC installation stds. require the use of purple primer on every fitting. Expose all fittings for inspection. 3. Secure tracer wire to proper piping. Test down on rain leaders. Test down on gas piping. Trench soils are too wet for inspection. Under ground piping to be supported continuously on a firm bed. No bridging.
08/28/2012 PLUMBING - INTERMEDIATE Not ready for Inspection NO ACCESS FOR INSPECTIONS.