Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - MEDICAL GAS/TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2013 | PLUMBING - MEDICAL GAS/TEST | Approved | PER RMYERS | |
| 07/09/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1 1/4" MEDGAS BELOW GROUND OK TO BACKFILL | |
| 05/14/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | Rooms #44, #46, #48, #50, and #52 Med gas in walls to corridor OK. Isolate metallic piping from other metals. | |
| 05/07/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 05/07/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | CHECKING LAYOUT | |
| 04/04/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :*ZONE TEST= OXYGEN 150 TEST VACUUM 150 TEST |
|
| 04/03/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | RMS 37,39,41,43 MED GAS IN WALLS TO OUTLETS | |
| 04/02/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* AT MECHANICAL SUPPLY- FRAME WALL FOR ELECTRIC PANELS | |
| 03/27/2013 | PLUMBING - MEDICAL GAS/TEST | Not ready for Inspection | ||
| 03/25/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. MEDICAL LOG IS TO BE AN ONSITE FOR INSPECTION OVER HEAD CONNECTIONS AT ZONE VALVE | |
| 03/18/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :*MED GAS EXTENDED TO ZONE VALUE PLUMBERS TAPE HAS NO APPROVAL FUNCTION IN MED GAS | |
| 03/12/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. #45, #47, #49, and #51 corridor patient piping from zone valve connected. Mains to the zone valve install today. | |
| 03/11/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Rooms 45 and 47 sheetrock nailing OK Med Gas overehead in corridor to room 49. | |
| 03/08/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Cart OK. Exterior piping OK. Daily log. | |
| 03/06/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. EOSE box hung today. | |
| 03/04/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 02/28/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Rooms #45, #47, #49 Medical Gas these rooms have 150# test from outlets to mains in corridor. | |
| 02/27/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Rooms #51 and #53 Med. Gas from outlet to mains. Med Gas cart OK. Daily log OK. | |
| 02/26/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | IVRS - Inspection :* | |
| 01/31/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Vacuum from mechanical room to corridor OK. Vacuum and oxygen in corridor. ESOE stubbed out of building. 2- one inch lines stubbed out of building for bulk tank. Material storage OK. Tanks OK. | |
| 01/30/2013 | PLUMBING - MEDICAL GAS/TEST | Not ready for Inspection | ||
| 01/29/2013 | PLUMBING - MEDICAL GAS/TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 01/25/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Medical Gas labeling to be minimum required by code, plus in each bay between studs.. Medical Gas in corridor to rooms #54, #56, #58. | |
| 01/24/2013 | PLUMBING - MEDICAL GAS/TEST | Partial Approval | 1. Existing, unapproved Med. Gas and Vacuum piping removed. New system in Room #58. Gang box OK. Tank storage OK. |