Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ENGINEERING - FINAL
Permit Number - T12CM04045
Inspection Description - ENGINEERING - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/22/2013 | ENGINEERING - FINAL | Not ready for Inspection | ||
03/22/2013 | ENGINEERING - FINAL | Approved | ||
03/21/2013 | ENGINEERING - FINAL | Not ready for Inspection | ||
03/19/2013 | ENGINEERING - FINAL | Continued | PROVIDE APPROVED AS-BUILTS FOR ALL CHANGES TO GRADING AND DRAINAGE. PROVIDE CERT LETTER FROM ENGINEER OF RECORD. | |
03/18/2013 | ENGINEERING - FINAL | Not ready for Inspection | ||
12/21/2012 | ENGINEERING - FINAL | Continued | Gave contrator # for right a way inspector. | |
11/13/2012 | ENGINEERING - FINAL | Continued | TRASH ENCLOSURE TO BE INSTALLED PER DEVELOPMENT STANDARD NO.6-01-0 |