Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2013 |
BUILDING - FINAL |
|
Approved |
|
| 11/18/2013 |
BUILDING - FINAL |
|
Not ready for Inspection |
1. All areas are to accessible for the inspector, including, roof, outside restroom, mechanical /electrical room. Re-read all corrections on inspection history and complete all work on plan. Plumber must install per the approved plan. |
| 11/01/2013 |
BUILDING - FINAL |
|
Not ready for Inspection |
1. See detail 207 P2.2- Drain and overflow have strainers. See detail 212 P2.3- Condensate drain to terminate with a 90 degree elbow. See detail 211 P2.3- Water closet hammer arrestor. Note: All trim to conform to the plan. See detail 216 P2.3- Lavatory mixing valve. See detail 209 P2.3- One inch pan drain to daylight. Insulate all hot and return piping at water heater. Set all fixtures, caulk all fixtures. AVB required at hose bibb. Clean outs to be made per detail 214 Sheet 2.3. Require: Method of sterilization, clean bacteria report, backflow certification, Air balance report, may not be a complete list. |