Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2012 | FRAMING | Approved | ||
| 11/15/2012 | FRAMING | Denied | 1) Plumbing is incomplete and is not under test. 2) Mechanical plans must be on site for inspection. Mechanical duct work has blocked attic access points. 3) Red-lines for plan revisions must be on site before inspections and a letter of approval for the revision must be provided by the designer of record. All revisions to approved plans shall be submitted to PDSD for review and approval before the issuance of a final Certificate of occupancy.. |