Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2012 | ENGINEERING - FINAL | Approved | ||
| 09/28/2012 | ENGINEERING - FINAL | Denied | 1) INSTALL BIKE PARKING PER PLAN 2) INSTALL HC SIGN FOR ACCESSIBLE ROUTE PER PLAN. 3) INSTALL THRESHOLD FOR HC ACCESS TO BLDG |