Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2012 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 08/13/2012 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/13/2012 | ROOF NAILING | Not ready for Inspection | ANCHOR BOLTS WITH IN 12" OF IN PLATE. SPLICES AND PER SHEERWALL SCH. NAILS IN HANGERS DBI 2X4 GT FHA STRAPS AT PLUMBING PIPES A35 CLIPS AT BIRD BOARDS 5SD 1.3 B MISSSING AT GABEL AND NAIL OFF ROOF SHEATHING AT BIRD BLOCKS PER SD1.3B |