Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Prior to Final Inspectn
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/21/2012 |
ENGINEERING - FINAL |
|
Prior to Final Inspectn |
Check to see that PV solar panel is not less than 3-ft from ground Plans indicate 5-ft). Also, any new meter or electrical panel mounted on existing structure shall be no lower than 3-ft (between bottom of panel and ground). If all ok - please approve/close out FPUP T12OT00944. |