| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2012 | ENGINEERING - FINAL | Approved | David, As discussed on site East Bay 1)Move the hinges to the outside on the east bay and change the design to a single gate. Reduce cladding thickness to reduce load on gate and hinges. 2) Remove the south east bollard. West Bay Move hinges and gates out of pathway to allow as much clearance as possible. Thank the contractor for having Waste Mgmt come on site and drop the boxes. The info was perfect. Jeff |
|
| 11/08/2012 | ENGINEERING - FINAL | Continued | MET WITH DAVE AND JEFF FROM ENVIRONMENTAL SERVICES. ABOUT UNDER SIZE TRASH ENCLOUSER. | |
| 11/02/2012 | ENGINEERING - FINAL | Continued | REMOVE ALL CONSTRUCTION EQUIPMENT AND FENCING FROM PARKING AREA | |
| 10/29/2012 | ENGINEERING - FINAL | Continued | ARCHITECT UNABLE TO MEET ON SITE. |