Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - YARD WTR LINE/TEST
| Date |
Description |
Inspector |
Results |
Comments |
| 07/30/2013 |
PLUMBING - YARD WTR LINE/TEST |
|
Approved |
|
| 07/25/2013 |
PLUMBING - YARD WTR LINE/TEST |
|
Not ready for Inspection |
1. Tracer wire to be blue. Connected wiring to be made with a waterproof wire nut. Minimum cover for PEX is 12". Hose bibbs require atmospheric vacuum breakers. PEX in the drive requires 18" of cover. Trenches paralleling the footing may not be deeper than the footing unless it is at an angle of fortyfive degrees. |
| 07/18/2013 |
PLUMBING - YARD WTR LINE/TEST |
|
Cancelled |
IVRS - RI canceled |
| 01/18/2013 |
PLUMBING - YARD WTR LINE/TEST |
|
Not ready for Inspection |
IVRS - Inspection :* |