Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/24/2012 | PLUMBING - FINAL | Not ready for Inspection | PROVIDE DOCUMENTATION ALLOWING CELLULAR CORE ABS PROVIDE CONDENSATE KIT INSTALL INSTRUCTIONS SPECIFIED ON PG12 #2 DEDICATED OUTLET REQUIRED |
|
| 08/21/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 08/08/2012 | PLUMBING - FINAL | Denied | READ AND FOLLOW INSTALLATION INSTRUCTIONS FOR POWER VENTED WATER HEATER. SEE PAGES 10,11,12,AND 16. SOLID CORE ABS OR CELLULAR PVC OR PVC OK. SOLVENT CEMEMTING DIFFERENT TYPES OF PLASTIC PIPE IN DOORS IS PROHIBITED BY 1PC 605.9. (VERTICAL VENT) HAS BACK PITCH. PROTECT PLASTIC PIPE FROM UV RAYS. INSTALL A ROOF FLASHING. TERMINATE VENT AS SPECIFIED, B VENT CAP MAY NOT BE USED.. |
|
| 08/08/2012 | PLUMBING - FINAL | Not ready for Inspection | PLEASE IMPOSE A REINSPECTION FEE. CONTRACTOR SHALL PAY A REINSPECTION FEE FOR FAILURE TO COMPLY WITH PREVIOUSLY NOTED ITEMS. | |
| 08/06/2012 | PLUMBING - FINAL | Not ready for Inspection | B VENT MAY NOT BE USED PER INSTALL INSTRUCTIONS. CORRECT PIPE INSULATION. ALL JOINTS OF PLASTIC SHALL BE PROPERLY INSTALLED | |
| 07/26/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/11/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* PROVIDE PROPER VENTING OF GAS WATER HEATER, SEE INSTALLATION BOOKLET FOR BRADFORD WHITE WH PROTECT PIPE INSULATON FROM HEAT SOURCE. SUPPORT ALL TUBING MAKE MIXING VALVE ACCESSIBLE AIR CAP REQUIRED ON RELIEF DRAIN PLUG DRAIN PAN - OR PIPE RELIEF DRAIN TO APPROVED RECEPTOR SEDIMENT TRAP REQ ON GAS SUPPLY GAS FLEX IS UNDERSIZED FOR 76000 BTU PIPING MAY NOT BE RESTRICTED IN SIZE CORRECT PIPE INSULATION |