Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/13/2012 |
PLUMBING - INTERMEDIATE |
|
Approved |
|
| 08/16/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. Gas pressure test OK. 2. Insulation not per plan. Provide approval for half inch armaflex. 3. OK to cover walls subject to insulation approval. |
| 08/14/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. ABS is to be supported at each change of direction or elevation, and at the end of branches, then no more than four feet between hangers. Provide mid-story guides for vertical piping. Support all copper piping per Table 3-2 2006 UPC. OK to insulate hot piping per plan- See General Plumbing Notes #6. Water piping incomplete. |
| 08/06/2012 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :* |