Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/08/2012 | PLUMBING - FINAL | Not ready for Inspection | 1. Plumbing corrections made OK. 2. Identify and label circuit for water heater. 3. Verify that circuit is not overloaded | |
| 05/25/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) FLEX CONNECTOR UNDERSIZED FOR TANKLESS WATER HEATER 2) ELECTRICAL CIRCUIT INSTALLED WITHOUT INSPECTION 3) PLUMBING INSTALLED FOR CONDENSATE DRAIN NOT TO CODE 4) (ONLY ONE TRAP ON A TRAP ARM) 5) CONDENSATE DRAIN MAY NOT CONNECT TO THE SEWER 6) CONDENSATE DRAIN KINKED |