Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T12CM02952
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
06/08/2012 | PLUMBING - FINAL | Not ready for Inspection | 1. Plumbing corrections made OK. 2. Identify and label circuit for water heater. 3. Verify that circuit is not overloaded | |
05/25/2012 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) FLEX CONNECTOR UNDERSIZED FOR TANKLESS WATER HEATER 2) ELECTRICAL CIRCUIT INSTALLED WITHOUT INSPECTION 3) PLUMBING INSTALLED FOR CONDENSATE DRAIN NOT TO CODE 4) (ONLY ONE TRAP ON A TRAP ARM) 5) CONDENSATE DRAIN MAY NOT CONNECT TO THE SEWER 6) CONDENSATE DRAIN KINKED |