Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2012 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/25/2012 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE 18" OF METALIC PIPE FROM SWEAT CONNECTIONS TO PLASTIC 2) HAMMER ARRESTORS REQUIRED AT WB 3) SECURE TUBING ABOVE CEILING AND IN SOFFITS AT 32" PER MII 4) HB VAC BREAKER |