Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/07/2012 |
PLUMBING - ROUGH, SOIL |
|
Approved |
|
| 06/13/2012 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1. Correction at mop sink made OK. Recall for pre-slab. |
| 06/11/2012 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
1. Mailbox full 2. Post your address. 3. Where a vent connects to a horizontal drain, it shall have its invert taken off above the drainage centerline downstream of the trap being served. Each vent shall rise at least six inches above the flood rim before offsetting horizontally.. 2. OK to cover the rest. |