Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2012 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 05/22/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) MUST HAVE A MINIMUM OF TEN POUNDS AT THE TIME OF THE INSPECTION 2) NO CHANGE AT FURNACE W/H VENT 3) DO NOT USE METAL TAPE TO MAKE UP JOINTS, USE 2 SCREWS |
|
| 05/17/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PVC IS NOT APPROVED MATERIAL FOR T & P RELIEF DRAIN 2) WATER HEATER VENT MAY NOT BE CONNECTED UNDER THE FURNACE VENT 3) REQUIRE APPROVED VALVE 4) REQUIRE 10 POUND TEST ON SYSTEM, DO NOT TEST THRU APPLIANCES |
|
| 05/15/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |