Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2012 | PLUMBING - ROUGH, SOIL | Approved | OK PER PLUMBING FINAL | |
| 05/07/2012 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) CORRECTIONS OK 2) PLEASE PROVIDE APPROVAL OF CHANGE TO ABS FRONT PVC SPECIFIED |
|
| 05/04/2012 | PLUMBING - ROUGH, SOIL | Partial Approval | 1) 3" BLDG DRAIN REQUIRES A 3" CLEANOUT P3005.2.9 2) 2 WAY CLEANOUT SHOWN ON BOTH ? AND SANITARY DRAINS 3) PLAN SPECIFIES PVC DWV 4) PROCIDE A STAMPED LETTER OR REVISION FOR ANY CHANGES TO PLAN SPECS 5) KEEP ROCKS OFF OF PIPE 6) SHADE ALL PIPING |