Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2012 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 04/12/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) WATER HEATER FLUE PIPE MUST HAVE A MINIMUM OF 1" CLEARANCE TO COMBUSTIBLE MATERIAL 2) FLUE PIPE NOT PROPERLY INSTALLED 3) ROOF JACK REQUIRED FOR ALL ROOF PENETRATIONS, PROVIDE ROOF JACK WHERE GAS PIPE ENTERS ATTIC SPACE 4) FURNACE FLUE PIPE MUST HAVE PROPER CLEARANCE TO COMBUSTIBLES 5) MINIMUM HOUSING REQIREMENTS REQUIRE ALL DWELLINGS TO HAVE AN ABILITY TO COODE, THESE UNITS PROVIDE NO MEANS (GAS OR ELECTRIC) FOR A STOVE, THIS MUST BE DONE PRIOR TO OCCUPANCY |