05/11/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
04/23/2012 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED FAFCO INSTALLATION MANUAL FORM PREVIOUS INSPECTION 2) REPLACE DAMAGED ROOF TILES AND TILES FROM PREVIOUS VALLEY MOUNT 3) DOES 2ND TANK HAVE SPARK PRODUCING EQUIPMENT |
|
04/12/2012 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COLLECTORS HAVE NOT BEEN INSTALLED AS SPECIFIED ON PG 14 OF YOUR FAFCO INSTALLATION MANUAL. YOU ARE SHOWED TO ANCHOR INTO THE PEAKS OF CURVED ROOF TILES, YOU HAVE PENETRATED THE VALLEYS 2) PROVIDE THE SPECIFIED COMMERCIALLY AVAILABLE TILE MOUNTING SYSTEM WITH FLASHINGS. SEE PAGE 14 3) PROVIDE FLEXIBLE PIPE FLASHINGS 4) REPLACE ANY AND ALL DAMAGED ROOF TILES 5) ALL TUBING REQUIRES SUPPORT WITH CLAMPS AT 32" ON CENTER MAX. 6) PIPE STORAGE TANK RELIEF DRAIN TO EXTERIOR 7) SPARK PRODUCING EQUIPMENT REQUIRES MINIMUM 18" ABOVE FLOOR 8) REMOVE FLUX FROM COPPER TUBING-REAM ALL JOINTS |