Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2012 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/01/2012 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A 4 PIPE CONNECTION SOLAR STORAGE TANK AS SHOWN ON YOUR OG 300 PLAN OR REVISE TO SHOW CONNECTIONS AT DRAIN VALVE AND T & P LOCATION 2) TANK SHALL BE SUPPORTED ON A LEVEL PLATFORM 3) RELIEF VALVE TEMPERATURE PROBE SHALL EXTEND INTO TANK 4" 4) PROVIDE PIPE CLAMPS THAT DO NOT COMPRESS OR DAMAGE PIPE INSULATION SECURE TUBING ABOVE CEILING AT MAX 32" AND ISOLATE FROM ANY SHARP EDGES OR METAL |