Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2012 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* | |
| 03/30/2012 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1`) PROVIDE PROPER MAKE UP OF VENT CONNECTORS 2) PROVIDE A TEST ON ENTIRE SYSTEM 3) PROVIDE ELECTRICAL BONDING OF GAS SYSTEM 4) SHADE TUBE AND REMOVE ROCKS 5) CORRECT DRYER VENT TERMINATION 6) 15 PSI GAUGE REQUIRED 7) YARD LINE IS UNDERSIZED |