Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2014 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/31/2014 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/25/2013 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/25/2013 | BUILDING - FINAL | Not ready for Inspection | ROOF RAFTERS UNDERSIZED. PROVIDE H2.5 AT HOUSE | |
| 07/03/2012 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE 6FCI ON ALL EXTECION RECEPTS 2. EXPOSE RAFTERS IN TWO PLANS AT HOUSE TO VERIFY POSITION CONNECTION 3. EXPOSE ROMEY AT BOXS TO CHECK CONNECTIONS 4. EXPOSE ONE FOOTINGS TO VERIFY DEPTH AND WIDTH 5. CHECK RAFTER SIZE AND SPACING "UNDERSIZED" |