Inspection Status: Approved
Inspection History: SITE - SEWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2012 | SITE - SEWER | Approved | IVRS - Inspection :* | |
| 03/23/2012 | SITE - SEWER | Partial Approval | IVRS - Inspection :* | |
| 03/22/2012 | SITE - SEWER | Partial Approval | INSPECTION PER HIGH LIGHT ON PAGE ON C4 ON AP PLANS ALL PIPING AND MAN HOLES TO BE TEST AT LATER DATE. | |
| 03/22/2012 | SITE - SEWER | Partial Approval | 1) ALL PIPING AND MAN HOLES OK, SUBJECT TO TESTING AND VERIFICATION OF GRADE 2) COORDINATE IN ADVANCE WITH INSPECTOR AND 3RD PARTY ENGINEER FOR TESTING 3) PERMIT REQUIRED TO BE ON SITE |
|
| 03/21/2012 | SITE - SEWER | Partial Approval | 1) WORK STARTED PRIOR TO PRE-CON MEETING 2) ENGINEER INVOLVEMENT REQUIRED. PCDEQ 3) CHECK WITH MAGNUM 4) CALL FOR DAILY INSPECTION 5) PIPING BETWEEN MH 1 & 2 OK PER RDLD; SUBJECT TO TEST AND VERIFICATION OF GRADE 6) CONNECTION TO EXISTING MH INSPECTED BY MICHAEL ROBERTS WITH PIMA CO. 7) 8" PIPING FROM MH 1 TO EXISTING OK |
|
| 03/20/2012 | SITE - SEWER | Partial Approval | IVRS - Inspection :* |